Quote coordination for a metal stamping press supplier starts with one shared envelope: material and thickness, required load and the millimetres above bottom dead center where it is applied, working energy in joules, stroke, intended SPM with the production die, die height, bolster size, permitted die mass in kg, connected load in kW and the three-phase supply. Metal Stamping Press Sourcing lines those inputs so metal stamping press manufacturers reply on included items rather than catalog headlines that omit inclusions. We remain an independent sourcing partner; named plants answer feasibility. Brochure no-load SPM that omits feed timing is not a comparable duty cycle. Ask each shortlist plant whether the die fits the bolster and die-mass envelope before treating two quotes as interchangeable.

Procurement desk comparing stamping press drawings and die-space tables

Service stage and responsibilities

Supplier shortlist

Supplier shortlist
Decision point Evidence or question
Supplier shortlist: Sample run Require each bidder to state force at the rating point, working energy for the full stroke, and the slide motion used with a representative die. Empty-cycle SPM is not the sample run.
Site readiness Collect pit or floor load, compressed air demand, cooling if the drive needs it, PLC interface names and feed-line footprint. Site work stays separately quoted unless the bid drawing includes it.
Owner acceptance Name who signs FAT and SAT, which run length counts, and who supplies the production die. Owner acceptance is a contract step, not a website certificate.

Assumptions every metal stamping press supplier should quote in writing: coil or blank size, lubrication, off-centre loading if expected, and whether tooling protection and part detection are included. If a plant cannot confirm die mass against the listed envelope, keep that factory off the shortlist until a drawing arrives. Certificates such as CE or UL, when relevant to destination, are requested as supplier documents for the named machine, not as a claim that one mark covers the whole cell.

Work envelope and footprint belong beside electrical data. A gap-frame press that fits the shop door may still fail if the bolster is smaller than the die shoe. Positioning tolerance of the slide and the feeder pitch are separate checks. We circulate one brief, return comparable quotations, and leave engineering acceptance between you and the equipment supplier. No existing quotation is required to start.

Confirm interfaces before circulating the supplier brief